Does Avanan (Check Point Harmony) integrate with Gradient MSP Synthesize?

Sync depth, webhook support, known API limits and setup order for the Avanan (Check Point Harmony) + Gradient MSP Synthesize pairing.

Compatibility index
75/100

Manual mailbox counts

Partial integration
API depth: grades B / AMulti-tenancy: 4/5 and 5/5Webhook events: supported both sides

Data flow diagram

How records move between the two systems once the integration is enabled.

AV
Avanan (Check Point Harmony)
Email Security
API B
AlertsAvanan (Check Point Harmony) Gradient MSP Synthesize
Devices / assetsAvanan (Check Point Harmony) Gradient MSP Synthesize
TicketsGradient MSP Synthesize Avanan (Check Point Harmony)
Time & billingGradient MSP Synthesize Avanan (Check Point Harmony)
GR
Gradient MSP Synthesize
Billing & CPQ
API A

Integration checklist

  • Bidirectional ticket / alert sync

    One-way alert push only — closing the ticket does not clear the alert.

  • Asset / device mapping

    Devices match to client records automatically after the initial mapping pass.

  • Alert escalation rules

    Escalation logic has to live in one system; expect duplicated rule sets.

  • Billing reconciliation

    Counts must be exported and matched by hand each month.

  • Webhook / event support

    Both sides expose event webhooks (API grades B and A).

Common bottlenecks & caveats

  • Sync depth is partial — budget technician time or an automation platform such as Rewst.
  • Field mapping is not retroactive: records created before the integration is enabled usually need a one-time backfill.

Avanan (Check Point Harmony) + Gradient MSP Synthesize: frequently asked questions

Does Avanan (Check Point Harmony) integrate with Gradient MSP Synthesize?
Partially — Avanan (Check Point Harmony) and Gradient MSP Synthesize connect, but not fully. Manual mailbox counts The pairing scores 75 out of 100 on our compatibility index.
How do you set up Avanan (Check Point Harmony) with Gradient MSP Synthesize?
Create an API user or integration key in Avanan (Check Point Harmony), authorise it in Gradient MSP Synthesize, map clients or tenants to each other once, then map alert severities to ticket priorities. Historic records created before the integration is enabled usually need a one-time backfill.
What are the known limitations of the Avanan (Check Point Harmony) + Gradient MSP Synthesize integration?
Sync depth is partial — budget technician time or an automation platform such as Rewst. Field mapping is not retroactive: records created before the integration is enabled usually need a one-time backfill.